Skip to content
ReviveTile Co.

Project videos • Reno, NV

Prep, waterproofing& the finished work.

Videos from real Revive Tile Co. jobs, showing the prep and waterproofing behind every tile. For photos, visit the Project Gallery.

Finished Marble-Look Shower

Marble-look walls, bench, niche and mosaic shower floor after the prep work is done.

Kitchen Backsplash: Natural Stone Range Inlay

A walk around the finished kitchen: a natural stone herringbone inlay behind the range and a subway backsplash with triple miters and pencil cuts.

Mitered Subway Tile Window Return

A close look at the subway tile wrapped around the kitchen window, with clean mitered corners.

Shower Waterproofing: Schluter-KERDI & FloFX NoFlo

Water running over a waterproofed shower floor, walls and niches before any tile goes on.

Water on the Schluter-KERDI Shower Pan

Water on the waterproofed shower pan and curb, with the bathroom floor tile set using leveling clips.

Shower Build: Mortar Bed to Waterproofing

A shower taken from the mortar bed through membrane waterproofing, step by step.

Subfloor Prep Before Tile

Preparing the subfloor with laser layout lines before underlayment and tile.

Scoring & Snapping Tile

Cutting tile cleanly on a manual tile cutter.

Hand-Polishing Tile Edges

Finishing cut tile edges by hand with polishing pads for a clean, smooth edge.

Jobsite Cutting Station

A look at the cutting and mixing setup we bring to every job.

Let's build somethingthat lasts.

Whether you envision a custom shower, a beautifully finished floor, or a one-of-a-kind feature, I would be honored to help bring it to life.

Not sure where to start? Try our free project planner

Reno • Sparks • Carson City • Washoe Valley